The contractors have been busy the last few days. Here is the start of the laminate wood floor that will run throughout the house.

Bill (the tile installer) gave us some great ideas on the fireplace. We are so happy with how it turned out.

Bill and Ben (his brother) installed the slate tile floor in the entry way. It matches the fireplace and looks amazing! The floor and the fireplace both get an enhancer/sealer that should really make the colors pop.

Our dishwasher and microwave got delivered. What other appliances do you need?

The ground around the house got graded as well. I think it gets an A+!

The siding has started to go on the back. They should be working on that all next week. We are getting close. We are about 3 weeks away from move in!